Planting
9500 Planter
9500 Planter
Maintence Plans - chains need to be inspected and replaced. Some master links will need to be replaced along with some chains. Some of the Hydraulic fittings and cylinders are leaking. Inspect and replace as needed. Marker Arm on the right side needs to be either removed or repaired. It failed last year.
Air Seeder
Air Seeder
Plans for Maintence still under development
Fertilizer Spreader Truck
Fertilizer Spreader Truck
Maintenance Plans: Hydraulic drives for the main chain requires repairing. Batteries have been replaced. Requires overall inspection and Maintenance. Maintenance scheduled beginning Late January through February
JD 750 Drill
JD 750 Drill